The Hot-Dip Galvanized Cantilever Racking system is designed for safe and organized storage of long, oversized, and irregular materials in outdoor or high-humidity environments. The hot-dip galvanized surface treatment provides strong corrosion resistance, making the system suitable for outdoor yards, coastal areas, construction material storage, and industrial warehouses.
Same as standard cantilever rack, our hot-dip galvanized cantilever rack featuring vertical columns with horizontal arms for storing long materials without front column obstruction. Different from powder-coating rack systems, the steel components are fully immersed in molten zinc during the galvanizing process, creating a durable protective coating against rust, rain, moisture, and harsh outdoor conditions. Suitable for both indoor and outdoor industrial storage applications.
HEDA SHELVES Hot-Dip Galvanized Cantilever Racking is widely used for storing:
| Technical Parameter | Specification Details |
| Column Construction | Q235B Cold Rolled structural steel |
| Arm Construction | Heavy-duty I-Beam profiles |
| Load Capacity | 1000KG to 4000KG per individual arm; |
| Connection Type | Multi-bolt heavy connector plates with high-tensile structural hex bolts |
| Stability Bracing | Custom center back bracing panels |
| Adjustability | Vertically adjustable arm positions on 4-inch (101.6mm) centers |
| Surface Protection | Hot-Dip Galvanized for outdoor yards |
| Compliance Standards | CE, and ISO9001 Certification |
Hot-dip galvanized cantilever racking is commonly used in:
A: Standard powder coating is ideal for indoor dry warehouses. However, for outdoor yards or chemical storage facilities, moisture and UV rays can chip paint and cause rapid internal rust. Hot-dip galvanization chemically bonds zinc to the Q235B cold-rolled steel, ensuring the entire frame—even inside hollow sections—is immune to rust, rainfall, and corrosive industrial air.
A: Yes, absolutely. We prioritize structural transparency for engineering and procurement compliance. We can provide complete Material Test Reports (MTR) confirming the structural integrity and chemical composition of our Q235B Cold Rolled Steel, alongside factory quality analysis upon your project request.
A: Our standard production lead time ranges from 15 to 45 days, depending on your specific layout engineering requirements and current factory volume. Our baseline MOQ is 50 sets, but we offer high flexibility based on the scale and custom dimensions of your engineering project.
A: We use robust, export-ready packaging materials. Columns, bases, and arms are securely bundled using protective heavy cartons and high-tensile Nylon bags to prevent scratching or shifting inside the container, guaranteeing they arrive at your facility ready for seamless installation.
A: No, it must be used in different lanes. If you want to mix different capacity racking in a warehouse, just ask our engineer for warehouse layout. For safety and structural integrity, components must match the column engineering limits. Our standard upright frames are strictly designed to support loads between 500kg and 1,500kg per level. If your inventory weights scale up toward 3,000kg per level, our engineers will custom-configure a dedicated Heavy-Duty structural column setup for you.